Execution of this contract - start of the footings, lower level columns and beams, concrete floors and transfer land
30%
งวดที่ 2
Start of the first level ( include swimming pool structure ) and second level columns and beams, concrete floors
25%
งวดที่ 3
Start of roof structure, electrical conduits and wiring, and all water plumbing, all ceilings (both internal and external), exterior roof soffets, wall plastering and skim coating, , floor tiling, bath tiling, and pool tiling, , the brickwork, including b
20%
งวดที่ 4
Start of installation of all doors, windows, lighting (interior, exterior and pool), electrical switches and outlets, install air-con , installation of all sanitary items (including bathroom showers, sinks, bathtub, and toilets), kitchen and the completio